Client: Department of Works Malaysia Project: Highway Simpang Pulai-Lojing-Gua Musang-Kuala Berang (Package 8 ) Result: Proposed alignments were evaluated, alternatives on structures and junctions were recommended and optimised the project cost from RM92million to RM85million without compromising the needed requirements
Airport & Aviation
Client: Malaysia Airports Holdings Berhad Project: Kuala Lumpur International Airport 2 (KLIA2) – Located next to the existing main KLIA and it is developed to replace the current temporary Low Cost Carrier Terminal (LCCT) Result: We have conducted over 50 VM workshops for the project and have achieved a remarkable saving of more than 25% from the original development cost of RM4.8billion