• 603 5524 7223
  • Shah Alam, Selangor, MALAYSIA

Civil Engineering

Client: Department of Works Malaysia

Project: Highway Simpang Pulai-Lojing-Gua Musang-Kuala Berang (Package 8 )

Result: Proposed alignments were evaluated, alternatives on structures and junctions were recommended and optimised the project cost from RM92million to RM85million without compromising the needed requirements