{"id":168,"date":"2023-03-06T05:21:12","date_gmt":"2023-03-06T05:21:12","guid":{"rendered":"http:\/\/mcmvalue.com\/v5\/?p=168"},"modified":"2023-03-06T05:46:51","modified_gmt":"2023-03-06T05:46:51","slug":"airport-aviation","status":"publish","type":"post","link":"http:\/\/mcmvalue.com\/v5\/2023\/03\/06\/airport-aviation\/","title":{"rendered":"Airport &amp; Aviation"},"content":{"rendered":"\n<p><strong>Client: <\/strong>Malaysia Airports&nbsp;Holdings Berhad<\/p>\n\n\n\n<p><strong>Project: <\/strong>Kuala Lumpur International Airport 2 (KLIA2) &#8211; Located next to the existing main KLIA and it is developed to replace the current temporary Low Cost&nbsp;Carrier Terminal (LCCT)<\/p>\n\n\n\n<p><strong>Result:&nbsp;<\/strong>We have conducted over&nbsp;50 VM workshops&nbsp;for the project and have achieved a remarkable&nbsp;saving of&nbsp;more than 25%&nbsp;from the original development cost of&nbsp;RM4.8billion<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\"><div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"654\" height=\"348\" src=\"http:\/\/mcmvalue.com\/v5\/wp-content\/uploads\/2023\/03\/aviation1.png\" alt=\"\" class=\"wp-image-174\" srcset=\"http:\/\/mcmvalue.com\/v5\/wp-content\/uploads\/2023\/03\/aviation1.png 654w, http:\/\/mcmvalue.com\/v5\/wp-content\/uploads\/2023\/03\/aviation1-300x160.png 300w\" sizes=\"(max-width: 654px) 100vw, 654px\" \/><\/figure>\n<\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full\"><img decoding=\"async\" width=\"654\" height=\"503\" src=\"http:\/\/mcmvalue.com\/v5\/wp-content\/uploads\/2023\/03\/aviation2.png\" alt=\"\" class=\"wp-image-176\" srcset=\"http:\/\/mcmvalue.com\/v5\/wp-content\/uploads\/2023\/03\/aviation2.png 654w, http:\/\/mcmvalue.com\/v5\/wp-content\/uploads\/2023\/03\/aviation2-300x231.png 300w\" sizes=\"(max-width: 654px) 100vw, 654px\" \/><\/figure>\n<\/div><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Client: Malaysia Airports&nbsp;Holdings Berhad Project: Kuala Lumpur International Airport 2 (KLIA2) &#8211; Located next to the existing main KLIA and it is developed to replace the current temporary Low Cost&nbsp;Carrier Terminal (LCCT) Result:&nbsp;We have conducted over&nbsp;50 VM workshops&nbsp;for the project and have achieved a remarkable&nbsp;saving of&nbsp;more than 25%&nbsp;from the original development cost of&nbsp;RM4.8billion<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_eb_attr":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-168","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"_links":{"self":[{"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/posts\/168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/comments?post=168"}],"version-history":[{"count":2,"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/posts\/168\/revisions"}],"predecessor-version":[{"id":177,"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/posts\/168\/revisions\/177"}],"wp:attachment":[{"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/media?parent=168"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/categories?post=168"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/mcmvalue.com\/v5\/wp-json\/wp\/v2\/tags?post=168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}